新闻中心

News

Product

Contact

Jiangsu Oubang Pipe Clamp Manufacturing Co., Ltd.

Contact:  Porco

222.png 333.jpg 5555.png

Email : obpipeclamp@qq.com

Skype/WhatsApp/Wechat/mob

+86 183 6168 0199

Tel/Fax : 86 515 87226455

Address : No. 13, Yaoqiao 1st Road, SME Park, Funing County, Yancheng City


Pipe clamp installation program

Your current location: Home >> News >> Company News

Pipe clamp installation program

Date:2017-06-13 Author:Jiangsu Oubang Pipe Clamp Manufacturing Co., Ltd. Click:

Assembling on the welded plate Before assembly, in order to better determine the direction of the clamp, it is recommended to mark the fixed position first, then weld it, insert the lower part of the pipe body, and place the pipe to be fixed. Then put the other half of the tube body and cover and tighten with screws. Do not directly solder the bottom plate of the pipe clamp.

On the grounding rail, the rail can be welded to the foundation or fixed with screws. Then push the rail nut into the rail and turn it 90 degrees. Insert the lower half of the tube into the nut, put the tube to be fixed, and then put it. The upper half of the tube body and cover are fixed with screws.

Stack the assembly, the guide rail can be welded on the foundation, or fixed with screws. First install the upper and lower half of the pipe body, put the pipe to be fixed and put the upper half of the pipe body, fix it with screws, and pass the anti-loose cover. Prevent it from turning. Then install the second pipe clamp in the same way as above.

When assembling the elbow, when assembling the elbow, it should be fixed directly at the front and rear of the elbow with the Yongsheng pipe clamp. It is recommended that such a support point be a fixed position.


Url:http://en.jsobgj.com/news/357.html

Tag:Heavypipeclamp

Browse:

Share 一键分享